Permit: TR-UTL-0626-01004
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
8020 E TANQUE VERDE RD
Address NEW:
8020 E TANQUE VERDE RD
Apply Date:
06/17/2026
Applicant:
Kristine Schwartz
Description:
(1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.
Permit Reviews
Permit Number - TR-UTL-0626-01004
Permit Status: Inspections
Permit Description: (1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/09/2026 | REQUIRES RESUBMIT |
| 06/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/26/2026 | REQUIRES RESUBMIT |
| 07/20/2026 | RIGHT-OF-WAY REVIEW v.3 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-01004
Permit Status: Inspections
Permit Description: (1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 06/17/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/17/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/17/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/08/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less โ Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less โ greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More โ Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 07/08/2026 | Condition FPUP Approved and completed Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 07/08/2026 | Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post. |
| 07/08/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64) |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0626-01004
Permit Description: (1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |