Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8020 E TANQUE VERDE RD
Apply Date:
06/17/2026
Applicant:
Kristine Schwartz
Description:
(1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.

Permit Reviews

Permit Number - TR-UTL-0626-01004
Permit Status: Inspections
Permit Description: (1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.
Start Date Submittal Complete Date Status  
07/08/2026 RIGHT-OF-WAY REVIEW v.2 07/09/2026 REQUIRES RESUBMIT Review Details
06/17/2026 RIGHT-OF-WAY REVIEW v.1 06/26/2026 REQUIRES RESUBMIT Review Details
07/20/2026 RIGHT-OF-WAY REVIEW v.3 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01004
Permit Status: Inspections
Permit Description: (1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.
Total Outstanding Activity Conditions - 7
Date Name
06/17/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/17/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/17/2026 Traffic control set-up approved between 9AM - 3:30PM
07/08/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less โ€“ Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less โ€“ greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More โ€“ Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
07/08/2026 Condition FPUP Approved and completed Floodplain permit will be required prior to work. Within City of Tucson Right of Way.
07/08/2026 Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post.
07/08/2026 Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64)

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0626-01004
Permit Description: (1) 5x5 bellhole in dirt for crews to raise a gas valve box. No black top will be disturbed.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/22/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
8020 E TANQUE VERDE RD REVISED_V1.PDF DOCUMENTS VIEW
8020 E TANQUE VERDE RD SITE PLAN_V1.PDF DOCUMENTS VIEW