Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/16/2026
Applicant:
Austin Eslick
Description:
WO T152129. Install new riser on existing pole and pull in new UG cable.

Permit Reviews

Permit Number - TR-UTL-0626-01001
Permit Status: Complete
Permit Description: WO T152129. Install new riser on existing pole and pull in new UG cable.
Start Date Submittal Complete Date Status  
06/22/2026 RIGHT-OF-WAY REVIEW v.2 06/24/2026 APPROVED Review Details
06/17/2026 RIGHT-OF-WAY REVIEW v.1 06/17/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-01001
Permit Status: Complete
Permit Description: WO T152129. Install new riser on existing pole and pull in new UG cable.
Total Outstanding Activity Conditions - 6
Date Name
06/24/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
06/24/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
06/24/2026 Traffic control set-up approved between 9AM - 3:30PM
06/24/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/24/2026 Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64)
06/24/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0626-01001
Permit Description: WO T152129. Install new riser on existing pole and pull in new UG cable.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/29/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PERMIT MAP T152129_V1.PDF DOCUMENTS VIEW
REVISED TCP DB 72664 - 10290 E TANQUE VERDE RD - DROP LANE CLSOURE - T152129_V1.PDF DOCUMENTS VIEW