Permit: TR-UTL-0626-00997
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
4701 E BROADWAY BL
Address NEW:
4701 E BROADWAY BL
Apply Date:
06/16/2026
Applicant:
ANGEL MORALES
Description:
P.355271B Overbuild Pull 2178' of fiber cable through existing conduit
Permit Reviews
Permit Number - TR-UTL-0626-00997
Permit Status: Fees due
Permit Description: P.355271B Overbuild
Pull 2178' of fiber cable through existing conduit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/17/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00997
Permit Status: Fees due
Permit Description: P.355271B Overbuild
Pull 2178' of fiber cable through existing conduit
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/17/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/17/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/17/2026 | Business Access - The contractor shall always maintain safe and continuous access to all adjacent businesses during construction. |
| 06/17/2026 | Pedestrian Assistance - No pedestrian detour is proposed. Therefore, the sidewalk shall remain open and ADA compliant at all times during construction. Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented prior to sidewalk closure. |
| 06/17/2026 | Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 06/17/2026 | Traffic control set-up approved between 9AM - 3:30PM |