Permit: TR-UTL-0626-00994
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
938 E PRINCE RD
Address NEW:
938 E PRINCE RD
Apply Date:
06/16/2026
Applicant:
Brittany West
Description:
90 day permit please. Place 1065' of new strand over 5 spans and run 1065' of fiber. Place new aerial case and storage. Place 100' of new strand over 1 span and run 100' of fiber. Place new aerial case. Place 250' of new strand over 2 spans and run 250' of fiber. Bore 255' of new conduit and fiber, Place new risers at poles. Place 845' of new strand over 5 spans and run 845' of fiber. Place new aerial case and storage. Place 1590' of new strand over 8 spans and run 1590' of fiber. Place new aerial case, storage and riser. Place 200' of new strand over 1 span and run 200' of fiber. Bore 105' of new of new conduit and fiber. Place new vault and underground fiber case. Bore 940' of new of new conduit and fiber. Place new vault, underground fiber case and storage.
Permit Reviews
Permit Number - TR-UTL-0626-00994
Permit Status: Needs resubmittal
Permit Description: 90 day permit please. Place 1065' of new strand over 5 spans and run 1065' of fiber. Place new aerial case and storage. Place 100' of new strand over 1 span and run 100' of fiber. Place new aerial case. Place 250' of new strand over 2 spans and run 250' of fiber. Bore 255' of new conduit and fiber, Place new risers at poles. Place 845' of new strand over 5 spans and run 845' of fiber. Place new aerial case and storage. Place 1590' of new strand over 8 spans and run 1590' of fiber. Place new aerial case, storage and riser. Place 200' of new strand over 1 span and run 200' of fiber. Bore 105' of new of new conduit and fiber. Place new vault and underground fiber case. Bore 940' of new of new conduit and fiber. Place new vault, underground fiber case and storage.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/14/2026 | RIGHT-OF-WAY REVIEW v.5 | 08/16/2026 | REQUIRES RESUBMIT |
| 06/29/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/01/2026 | REQUIRES RESUBMIT |
| 08/17/2026 | RIGHT-OF-WAY REVIEW v.6 | 08/20/2026 | REQUIRES RESUBMIT |
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.3 | 07/06/2026 | REQUIRES RESUBMIT |
| 06/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/17/2026 | REQUIRES RESUBMIT |
| 08/13/2026 | RIGHT-OF-WAY REVIEW v.4 | 08/13/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00994
Permit Status: Needs resubmittal
Permit Description: 90 day permit please. Place 1065' of new strand over 5 spans and run 1065' of fiber. Place new aerial case and storage. Place 100' of new strand over 1 span and run 100' of fiber. Place new aerial case. Place 250' of new strand over 2 spans and run 250' of fiber. Bore 255' of new conduit and fiber, Place new risers at poles. Place 845' of new strand over 5 spans and run 845' of fiber. Place new aerial case and storage. Place 1590' of new strand over 8 spans and run 1590' of fiber. Place new aerial case, storage and riser. Place 200' of new strand over 1 span and run 200' of fiber. Bore 105' of new of new conduit and fiber. Place new vault and underground fiber case. Bore 940' of new of new conduit and fiber. Place new vault, underground fiber case and storage.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/16/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 06/16/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/16/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/16/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/16/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/16/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |