Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3563 N STONE AV
Address NEW:
3563 N STONE AV
Apply Date:
06/16/2026
Applicant:
Brittany West
Description:
90 day permit please. Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.

Permit Reviews

Permit Number - TR-UTL-0626-00993
Permit Status: Inspections
Permit Description: 90 day permit please. Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
Start Date Submittal Complete Date Status  
08/03/2026 RIGHT-OF-WAY REVIEW v.3 08/04/2026 APPROVED Review Details
06/16/2026 RIGHT-OF-WAY REVIEW v.1 06/17/2026 REQUIRES RESUBMIT Review Details
06/17/2026 RIGHT-OF-WAY REVIEW v.2 06/29/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00993
Permit Status: Inspections
Permit Description: 90 day permit please. Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
Total Outstanding Activity Conditions - 6
Date Name
06/16/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
06/16/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/16/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/16/2026 Traffic control set-up approved between 9AM - 3:30PM
06/16/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/16/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0626-00993
Permite Description: 90 day permit please. Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/04/2026 TRSP - ROW - AERIAL INSTALLATION N/A Re-inspection required Still work in progress need to extend permits or get a new one
11/04/2026 TRSP - ROW - Final N/A Re-inspection required Still work in progress need to extend permits or get a new one

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0626-00993
Permit Description: 90 day permit please. Place 2110' of new strand over 10 spans. Place 2110' of 288ct fiber. Place 110' of new strand over 1 span. Place 110' of 288ct fiber. Place 705' of new strand over 4 spans. Place 705' of 288ct fiber. Place 110' of new strand over 1 span. Place 100' of 288ct fiber. Tie Point will be existing splice case on aerial joint utility pole. Place 550' of new strand over 2 span.s Place 550' of 288ct fiber. Place 1320' of new strand over 6 spans. Place 1320' of 288ct fiber.
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/15/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/21/2026 TRSP - ROW - Barricade - Setup/Routine Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
MASTEC PHASE 3_V1.PDF DOCUMENTS VIEW