Permit: TR-UTL-0626-00992
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2482 E RIVER RD
Address NEW:
2482 E RIVER RD
Apply Date:
06/16/2026
Applicant:
Angeline Trejo
Description:
E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING Request for 30 Day Renewal as of 08/12/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0626-00992
Permit Status: Issued
Permit Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING
Request for 30 Day Renewal as of 08/12/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/26/2026 | REQUIRES RESUBMIT |
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.3 | 07/07/2026 | APPROVED |
| 06/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/17/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00992
Permit Status: Issued
Permit Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING
Request for 30 Day Renewal as of 08/12/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/17/2026 | ROW Permit is only allowed for work within City of Tucson Right of Way |
| 06/17/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/17/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/17/2026 | Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW |
| 06/17/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/17/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0626-00992
Permite Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING
Request for 30 Day Renewal as of 08/12/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | Work has not started. They're getting a renewal. |
| 08/13/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | Work has not started. They're getting a renewal. |
| 08/12/2026 | TRSP - ROW - Final | N/A | Re-inspection required | work has not started they renewed the permit for September reinspect when it’s completed |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0626-00992
Permit Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING
Request for 30 Day Renewal as of 08/12/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | work has not started, and they are extending their permit Right of way script was read and understood. The splicer will call us and text us when he is out there and there will be a barricade set up for that day. |