Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2482 E RIVER RD
Address NEW:
2482 E RIVER RD
Apply Date:
06/16/2026
Applicant:
Angeline Trejo
Description:
E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING Request for 30 Day Renewal as of 08/12/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0626-00992
Permit Status: Issued
Permit Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING Request for 30 Day Renewal as of 08/12/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
06/17/2026 RIGHT-OF-WAY REVIEW v.2 06/26/2026 REQUIRES RESUBMIT Review Details
07/06/2026 RIGHT-OF-WAY REVIEW v.3 07/07/2026 APPROVED Review Details
06/16/2026 RIGHT-OF-WAY REVIEW v.1 06/17/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00992
Permit Status: Issued
Permit Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING Request for 30 Day Renewal as of 08/12/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 6
Date Name
06/17/2026 ROW Permit is only allowed for work within City of Tucson Right of Way
06/17/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/17/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/17/2026 Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW
06/17/2026 Traffic control set-up approved between 9AM - 3:30PM
06/17/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-UTL-0626-00992
Permite Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING Request for 30 Day Renewal as of 08/12/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
08/13/2026 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required Work has not started. They're getting a renewal.
08/13/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required Work has not started. They're getting a renewal.
08/12/2026 TRSP - ROW - Final N/A Re-inspection required work has not started they renewed the permit for September reinspect when it’s completed

Completed Inspections

Permit Status: Issued
Permit Number: TR-UTL-0626-00992
Permit Description: E.1600.0030211-C.3107690 - ACCESS EXISTING MH 20885 FOR SPLICING Request for 30 Day Renewal as of 08/12/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/12/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed work has not started, and they are extending their permit Right of way script was read and understood. The splicer will call us and text us when he is out there and there will be a barricade set up for that day.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
E.1600.0030211-C.3107690 N CAMINO REAL - E RIVER RD - RIGHT LANE CLOSURE_V2.PDF DOCUMENTS VIEW
E.1600.0030211_CAD_REV0_06102025_TUCSON_V1.PDF DOCUMENTS VIEW
E.1600.0030211_SATELLITE_PLAN_REV0_06102026_V1.PDF DOCUMENTS VIEW