Permit: TR-UTL-0626-00990
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1810 W PRINCE RD
Address NEW:
1810 W PRINCE RD
Apply Date:
06/16/2026
Applicant:
Ramiro Corella
Description:
90 Day permit Please. Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber. Place 300' of new strand over 2 spans. Lash 300' of 288ct fiber. Place 1505' of new strand over 8 spans. Lash 1505' of 288ct fiber. Place 535' of new strand over 3 spans. Lash 535' of 288ct fiber. Place 100' of new strand over 1 spans. Lash 100' of 288ct fiber. Place 540' of new strand over 3 spans. Lash 540' of 288ct fiber. Place 105' of new strand over 1 spans. Lash 105' of 288ct fiber. Place 410' of new strand over 3 spans. Lash 410' of 288ct fiber. Place 125' of new strand over 1 spans. Lash 125' of 288ct fiber. Place 760' of new strand over 4 spans. Lash 760' of 288ct fiber. Place 340' of new strand over 2 spans. Lash 340' of 288ct fiber.
Permit Reviews
Permit Number - TR-UTL-0626-00990
Permit Status: Inspections
Permit Description: 90 Day permit Please. Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber. Place 300' of new strand over 2 spans. Lash 300' of 288ct fiber. Place 1505' of new strand over 8 spans. Lash 1505' of 288ct fiber. Place 535' of new strand over 3 spans. Lash 535' of 288ct fiber. Place 100' of new strand over 1 spans. Lash 100' of 288ct fiber. Place 540' of new strand over 3 spans. Lash 540' of 288ct fiber. Place 105' of new strand over 1 spans. Lash 105' of 288ct fiber. Place 410' of new strand over 3 spans. Lash 410' of 288ct fiber. Place 125' of new strand over 1 spans. Lash 125' of 288ct fiber. Place 760' of new strand over 4 spans. Lash 760' of 288ct fiber. Place 340' of new strand over 2 spans. Lash 340' of 288ct fiber.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/17/2026 | REQUIRES RESUBMIT |
| 06/17/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/29/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00990
Permit Status: Inspections
Permit Description: 90 Day permit Please. Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber. Place 300' of new strand over 2 spans. Lash 300' of 288ct fiber. Place 1505' of new strand over 8 spans. Lash 1505' of 288ct fiber. Place 535' of new strand over 3 spans. Lash 535' of 288ct fiber. Place 100' of new strand over 1 spans. Lash 100' of 288ct fiber. Place 540' of new strand over 3 spans. Lash 540' of 288ct fiber. Place 105' of new strand over 1 spans. Lash 105' of 288ct fiber. Place 410' of new strand over 3 spans. Lash 410' of 288ct fiber. Place 125' of new strand over 1 spans. Lash 125' of 288ct fiber. Place 760' of new strand over 4 spans. Lash 760' of 288ct fiber. Place 340' of new strand over 2 spans. Lash 340' of 288ct fiber.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 06/16/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 06/16/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/16/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/16/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/16/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/16/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. |
| 06/29/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 06/29/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 06/29/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0626-00990
Permite Description: 90 Day permit Please. Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber. Place 300' of new strand over 2 spans. Lash 300' of 288ct fiber. Place 1505' of new strand over 8 spans. Lash 1505' of 288ct fiber. Place 535' of new strand over 3 spans. Lash 535' of 288ct fiber. Place 100' of new strand over 1 spans. Lash 100' of 288ct fiber. Place 540' of new strand over 3 spans. Lash 540' of 288ct fiber. Place 105' of new strand over 1 spans. Lash 105' of 288ct fiber. Place 410' of new strand over 3 spans. Lash 410' of 288ct fiber. Place 125' of new strand over 1 spans. Lash 125' of 288ct fiber. Place 760' of new strand over 4 spans. Lash 760' of 288ct fiber. Place 340' of new strand over 2 spans. Lash 340' of 288ct fiber.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | continuation and they will need another barricade set up for tonight |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0626-00990
Permit Description: 90 Day permit Please. Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber. Place 300' of new strand over 2 spans. Lash 300' of 288ct fiber. Place 1505' of new strand over 8 spans. Lash 1505' of 288ct fiber. Place 535' of new strand over 3 spans. Lash 535' of 288ct fiber. Place 100' of new strand over 1 spans. Lash 100' of 288ct fiber. Place 540' of new strand over 3 spans. Lash 540' of 288ct fiber. Place 105' of new strand over 1 spans. Lash 105' of 288ct fiber. Place 410' of new strand over 3 spans. Lash 410' of 288ct fiber. Place 125' of new strand over 1 spans. Lash 125' of 288ct fiber. Place 760' of new strand over 4 spans. Lash 760' of 288ct fiber. Place 340' of new strand over 2 spans. Lash 340' of 288ct fiber.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | They're switching to night work for the road crossing on prince other than that no major changes and they're putting in for tne now |