Permit: TR-UTL-0626-00989
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
1459 E IOWA DR
Address NEW:
1459 E IOWA DR
Apply Date:
06/16/2026
Applicant:
Tucson Electric Power
Description:
WO T178719 - REPLACING WOOD POLE WITH STEEL POLE 09/15/2026 - Request for 30 Day Renewal as of 09/28/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0626-00989
Permit Status: Issued
Permit Description: WO T178719 - REPLACING WOOD POLE WITH STEEL POLE
09/15/2026 - Request for 30 Day Renewal as of 09/28/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/16/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00989
Permit Status: Issued
Permit Description: WO T178719 - REPLACING WOOD POLE WITH STEEL POLE
09/15/2026 - Request for 30 Day Renewal as of 09/28/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/16/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 06/16/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/16/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/16/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0626-00989
Permit Description: WO T178719 - REPLACING WOOD POLE WITH STEEL POLE
09/15/2026 - Request for 30 Day Renewal as of 09/28/2026
Permit Renewal Notice
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |