Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
72 E CONGRESS ST
Address NEW:
72 E CONGRESS ST
Apply Date:
06/12/2026
Applicant:
Ilana Galluzzo
Description:
APPROX 2' X 175' TRENCH IN PAVEMENT/DIRT STARTING IN THE ALLEYWAY BEHIND 118 E CONGRESS ST GOING WEST, CROSSING SCOTT AVE AND CONNECTING WITH AN ADDITIONAL APPROX 2' X 50' TRENCH RUNNING PARALLEL TO SCOTT AVE TO INSTALL NEW GAS SERVICE TO 72 E CONGRESS.

Permit Reviews

Permit Number - TR-UTL-0626-00977
Permit Status: Issued
Permit Description: APPROX 2' X 175' TRENCH IN PAVEMENT/DIRT STARTING IN THE ALLEYWAY BEHIND 118 E CONGRESS ST GOING WEST, CROSSING SCOTT AVE AND CONNECTING WITH AN ADDITIONAL APPROX 2' X 50' TRENCH RUNNING PARALLEL TO SCOTT AVE TO INSTALL NEW GAS SERVICE TO 72 E CONGRESS.
Start Date Submittal Complete Date Status  
06/12/2026 RIGHT-OF-WAY REVIEW v.1 08/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00977
Permit Status: Issued
Permit Description: APPROX 2' X 175' TRENCH IN PAVEMENT/DIRT STARTING IN THE ALLEYWAY BEHIND 118 E CONGRESS ST GOING WEST, CROSSING SCOTT AVE AND CONNECTING WITH AN ADDITIONAL APPROX 2' X 50' TRENCH RUNNING PARALLEL TO SCOTT AVE TO INSTALL NEW GAS SERVICE TO 72 E CONGRESS.
Total Outstanding Activity Conditions - 6
Date Name
06/15/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
06/15/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/15/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/15/2026 Traffic control set-up approved between 9AM - 3:30PM
06/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/15/2026 We have streetcar lines that run along this location. Sunlink will determine if there are any additional requirements for your request. This is done by a track access request using the following link: https://www.suntran.com/wp-content/uploads/2025/07/Track-Access-Permit-Request_Rev06-20220520.pdf

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW