Permit: TR-UTL-0626-00975
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
6012 E 30TH ST
Address NEW:
6012 E 30TH ST
Apply Date:
06/11/2026
Applicant:
ANGEL MORALES
Description:
P.356690B Overbuild Trench 27' to place conduit and fiber cable Place 4531' of aerial fiber cable Place 1 pedestal
Permit Reviews
Permit Number - TR-UTL-0626-00975
Permit Status: Fees due
Permit Description: P.356690B Overbuild
Trench 27' to place conduit and fiber cable
Place 4531' of aerial fiber cable
Place 1 pedestal
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/02/2026 | APPROVED |
| 06/11/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/15/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00975
Permit Status: Fees due
Permit Description: P.356690B Overbuild
Trench 27' to place conduit and fiber cable
Place 4531' of aerial fiber cable
Place 1 pedestal
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/12/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/12/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/02/2026 | Bus Stop - Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts |
| 07/02/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 07/02/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/02/2026 | Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |