Permit: TR-UTL-0626-00973
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
6249 E CALLE AURORA
Address NEW:
6249 E CALLE AURORA
Apply Date:
06/11/2026
Applicant:
ANGEL MORALES
Description:
P.356690A Overbuild Trench 138' to place conduit and fiber cable Place 5127' of aerial fiber cable Place 2 hand holes and 2 pedestals
Permit Reviews
Permit Number - TR-UTL-0626-00973
Permit Status: Fees due
Permit Description: P.356690A Overbuild
Trench 138' to place conduit and fiber cable
Place 5127' of aerial fiber cable
Place 2 hand holes and 2 pedestals
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/11/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00973
Permit Status: Fees due
Permit Description: P.356690A Overbuild
Trench 138' to place conduit and fiber cable
Place 5127' of aerial fiber cable
Place 2 hand holes and 2 pedestals
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 06/12/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 06/12/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/12/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/12/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/12/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/26/2026 | Business Access - The contractor shall always maintain safe and continuous access to all adjacent businesses during construction. |
| 06/26/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 06/26/2026 | Pavement Restoration - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 06/26/2026 | Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |