Permit: TR-UTL-0626-00960
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
123 S STONE AV
Address NEW:
123 S STONE AV
Apply Date:
06/08/2026
Applicant:
Adrien Pineda
Description:
*PLEASE NOTE ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH NO NEW DEPTH OR TRENCH WILL BE EXCAVATED* ARIZONA PIPIELINE CO WLL NEED TO EXCAVTAE (1) 5X5 BLL HOLE IN ASPHALT ROAD IN ORDER TO ABANDON EXISTING GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0626-00960
Permit Status: Needs resubmittal
Permit Description: *PLEASE NOTE ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH NO NEW DEPTH OR TRENCH WILL BE EXCAVATED*
ARIZONA PIPIELINE CO WLL NEED TO EXCAVTAE (1) 5X5 BLL HOLE IN ASPHALT ROAD IN ORDER TO ABANDON EXISTING GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/09/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/17/2026 | REQUIRES RESUBMIT |
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/24/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00960
Permit Status: Needs resubmittal
Permit Description: *PLEASE NOTE ALL WORK IS BEING CONDUCTED IN THE EXISTING TRENCH NO NEW DEPTH OR TRENCH WILL BE EXCAVATED*
ARIZONA PIPIELINE CO WLL NEED TO EXCAVTAE (1) 5X5 BLL HOLE IN ASPHALT ROAD IN ORDER TO ABANDON EXISTING GAS SERVICE
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/10/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 06/10/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/10/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/10/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/10/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/11/2026 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. |