Permit: TR-UTL-0626-00959
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
6724 S BURCHAM AV
Address NEW:
6724 S BURCHAM AV
Apply Date:
06/08/2026
Applicant:
Robert Reynolds - National Barricade
Description:
5X5 BELL HOLE IN DIRT DOING A STREET CROSSING ON BURCHAM AVE TO REPLACE GAS LINE. 08/14/26- Renew permit for 30 days as of 07/26/26 new expiration date is 08/25/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0626-00959
Permit Status: Fees due
Permit Description: 5X5 BELL HOLE IN DIRT DOING A STREET CROSSING ON BURCHAM AVE TO REPLACE GAS LINE.
08/14/26- Renew permit for 30 days as of 07/26/26 new expiration date is 08/25/26.
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/08/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/22/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00959
Permit Status: Fees due
Permit Description: 5X5 BELL HOLE IN DIRT DOING A STREET CROSSING ON BURCHAM AVE TO REPLACE GAS LINE.
08/14/26- Renew permit for 30 days as of 07/26/26 new expiration date is 08/25/26.
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/09/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/09/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/09/2026 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Fees Due
Permit Number: TR-UTL-0626-00959
Permite Description: 5X5 BELL HOLE IN DIRT DOING A STREET CROSSING ON BURCHAM AVE TO REPLACE GAS LINE.
08/14/26- Renew permit for 30 days as of 07/26/26 new expiration date is 08/25/26.
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | voicemail left for contractor, awaiting project status update |
| 07/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | voicemail left for contractor, awaiting project status update |
| 07/23/2026 | TRSP - ROW - Final | N/A | Re-inspection required | voicemail left for contractor, awaiting project status update |
Completed Inspections
Permit Status: Fees Due
Permit Number: TR-UTL-0626-00959
Permit Description: 5X5 BELL HOLE IN DIRT DOING A STREET CROSSING ON BURCHAM AVE TO REPLACE GAS LINE.
08/14/26- Renew permit for 30 days as of 07/26/26 new expiration date is 08/25/26.
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Eligio, job is not scheduled to start for at least two weeks. Will be notified with confirmed start date for barricade set up inspection. |