Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/08/2026
Applicant:
Austin Eslick
Description:
WO T173727. Adding OH wire to an existing pole line across Tanque Verde Rd.

Permit Reviews

Permit Number - TR-UTL-0626-00958
Permit Status: Complete
Permit Description: WO T173727. Adding OH wire to an existing pole line across Tanque Verde Rd.
Start Date Submittal Complete Date Status  
06/23/2026 RIGHT-OF-WAY REVIEW v.3 06/24/2026 REQUIRES RESUBMIT Review Details
06/08/2026 RIGHT-OF-WAY REVIEW v.1 06/15/2026 REQUIRES RESUBMIT Review Details
06/24/2026 RIGHT-OF-WAY REVIEW v.4 06/24/2026 APPROVED Review Details
06/16/2026 RIGHT-OF-WAY REVIEW v.2 06/23/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00958
Permit Status: Complete
Permit Description: WO T173727. Adding OH wire to an existing pole line across Tanque Verde Rd.
Total Outstanding Activity Conditions - 5
Date Name
06/10/2026 Traffic control set-up approved between 9AM - 3:30PM
06/24/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less โ€“ Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less โ€“ greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More โ€“ Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
06/24/2026 Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post.
06/24/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/24/2026 Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64)

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0626-00958
Permit Description: WO T173727. Adding OH wire to an existing pole line across Tanque Verde Rd.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/16/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/21/2026 TRSP - ROW - Barricade - Setup/Routine Passed
09/21/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
3RD REVISION DB 72620 - 10509 E TANQUE VERDE RD - 2 WAY FLAGGER - T173727_V1.PDF DOCUMENTS VIEW
PERMIT MAP T173727_V1.PDF DOCUMENTS VIEW