Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
255 W OKLAHOMA ST
Apply Date:
06/08/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-0626-00957
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Start Date Submittal Complete Date Status  
06/08/2026 RIGHT-OF-WAY REVIEW v.1 06/10/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00957
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Total Outstanding Activity Conditions - 5
Date Name
06/08/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/08/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/08/2026 Traffic Control set-up approved between 7AM - 5PM
06/08/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/10/2026 - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0626-00957
Permit Description: ARIZONA PIPELINE WILL NEED TO EXAVATE 1 5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/15/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/23/2026 TRSP - ROW - Barricade - Setup/Routine Passed
06/23/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
09/17/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
225 W OKLAHOMA ST AIREAL_V1.PDF DOCUMENTS VIEW
255 W OKLAHOMA ST SITE_V1.PDF DOCUMENTS VIEW
APC- 255 W OKLAHOMA ST - FLAGGING STATION - 26-050 APC_V1.PDF DOCUMENTS VIEW