Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4440 S CAMPBELL AV
Apply Date:
06/05/2026
Applicant:
Angeline Trejo
Description:
M.1600.0014039 1) Remove aerial cable facility off poles from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ 2) Remove aerial cable facility off poles from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 300’ outside COT R/W Lumen / TEP Ju pole-01795 3) Place cable facility in existing conduit from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 280’ outside COT R/W new ped placement adjacent to Lumen / TEP Ju pole-01795 4) Place 100 pr aerial cable facility from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ attach to new TEP placed poles 5) Remove 1 down guy & anchor rod @ Sta 04+45 77’RT from pole east side Kino Blvd 6) Place 3 down guys & anchors @ new TEP Ju poles east side Kino Blvd 7) Place 1 down guy & anchor west side of Kino Blvd outside COT R/W Lumen / TEP Ju pole-01795 8) Place 2 pedestals @ east side Kino Blvd & west side of Kino Blvd adjacent to Lumen / TEP Ju pole-01795 9) Will require Police assistance for traffic control north / south vehicular stoppage for aerial cable removal at time of construction scheduled time frame.

Permit Reviews

Permit Number - TR-UTL-0626-00953
Permit Status: Complete
Permit Description: M.1600.0014039 1) Remove aerial cable facility off poles from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ 2) Remove aerial cable facility off poles from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 300’ outside COT R/W Lumen / TEP Ju pole-01795 3) Place cable facility in existing conduit from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 280’ outside COT R/W new ped placement adjacent to Lumen / TEP Ju pole-01795 4) Place 100 pr aerial cable facility from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ attach to new TEP placed poles 5) Remove 1 down guy & anchor rod @ Sta 04+45 77’RT from pole east side Kino Blvd 6) Place 3 down guys & anchors @ new TEP Ju poles east side Kino Blvd 7) Place 1 down guy & anchor west side of Kino Blvd outside COT R/W Lumen / TEP Ju pole-01795 8) Place 2 pedestals @ east side Kino Blvd & west side of Kino Blvd adjacent to Lumen / TEP Ju pole-01795 9) Will require Police assistance for traffic control north / south vehicular stoppage for aerial cable removal at time of construction scheduled time frame.
Start Date Submittal Complete Date Status  
06/05/2026 RIGHT-OF-WAY REVIEW v.1 06/22/2026 REQUIRES RESUBMIT Review Details
06/25/2026 RIGHT-OF-WAY REVIEW v.2 06/25/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00953
Permit Status: Complete
Permit Description: M.1600.0014039 1) Remove aerial cable facility off poles from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ 2) Remove aerial cable facility off poles from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 300’ outside COT R/W Lumen / TEP Ju pole-01795 3) Place cable facility in existing conduit from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 280’ outside COT R/W new ped placement adjacent to Lumen / TEP Ju pole-01795 4) Place 100 pr aerial cable facility from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ attach to new TEP placed poles 5) Remove 1 down guy & anchor rod @ Sta 04+45 77’RT from pole east side Kino Blvd 6) Place 3 down guys & anchors @ new TEP Ju poles east side Kino Blvd 7) Place 1 down guy & anchor west side of Kino Blvd outside COT R/W Lumen / TEP Ju pole-01795 8) Place 2 pedestals @ east side Kino Blvd & west side of Kino Blvd adjacent to Lumen / TEP Ju pole-01795 9) Will require Police assistance for traffic control north / south vehicular stoppage for aerial cable removal at time of construction scheduled time frame.
Total Outstanding Activity Conditions - 6
Date Name
06/10/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/10/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
06/10/2026 Traffic control set-up approved between 9AM - 3:30PM
06/10/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/10/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/10/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0626-00953
Permit Description: M.1600.0014039 1) Remove aerial cable facility off poles from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ 2) Remove aerial cable facility off poles from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 300’ outside COT R/W Lumen / TEP Ju pole-01795 3) Place cable facility in existing conduit from Sta 07+69 52’RT east side Kino Blvd crossing to the west side of Kino Blvd 280’ outside COT R/W new ped placement adjacent to Lumen / TEP Ju pole-01795 4) Place 100 pr aerial cable facility from Sta 04+45 77’RT to Sta 07+69 52RT east side Kino Blvd 300’ attach to new TEP placed poles 5) Remove 1 down guy & anchor rod @ Sta 04+45 77’RT from pole east side Kino Blvd 6) Place 3 down guys & anchors @ new TEP Ju poles east side Kino Blvd 7) Place 1 down guy & anchor west side of Kino Blvd outside COT R/W Lumen / TEP Ju pole-01795 8) Place 2 pedestals @ east side Kino Blvd & west side of Kino Blvd adjacent to Lumen / TEP Ju pole-01795 9) Will require Police assistance for traffic control north / south vehicular stoppage for aerial cable removal at time of construction scheduled time frame.
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/03/2026 TRSP - ROW - Barricade - Setup/Routine Passed
08/03/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/03/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
08/03/2026 TRSP - ROW - AERIAL INSTALLATION Passed
08/03/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW