Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
10015 E OLD VAIL RD
Apply Date:
06/05/2026
Applicant:
Cox Communications
Description:
PRJ316356-1: Cox to lash 2,494' of new CATV strand & bore 134' to install new CATV conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-0626-00951
Permit Status: Inspections
Permit Description: PRJ316356-1: Cox to lash 2,494' of new CATV strand & bore 134' to install new CATV conduit for system tie.
Start Date Submittal Complete Date Status  
06/26/2026 RIGHT-OF-WAY REVIEW v.2 06/29/2026 APPROVED Review Details
06/05/2026 RIGHT-OF-WAY REVIEW v.1 06/17/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00951
Permit Status: Inspections
Permit Description: PRJ316356-1: Cox to lash 2,494' of new CATV strand & bore 134' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 7
Date Name
06/09/2026 Traffic control set-up approved between 9AM - 3:30PM
06/09/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/09/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/10/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
06/29/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
06/29/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
06/29/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0626-00951
Permit Description: PRJ316356-1: Cox to lash 2,494' of new CATV strand & bore 134' to install new CATV conduit for system tie.
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/27/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/20/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed on-site meeting with RDI and Cox, barricade set up scheduled for Wednesday, 7/22

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ316356-1 REV TCP_V2.PDF DOCUMENTS VIEW
PRJ316356-1 TUCSON PLANS_V1.PDF DOCUMENTS VIEW