Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
115 N EUCLID AV
Address NEW:
115 N EUCLID AV
Apply Date:
06/05/2026
Applicant:
jose cantu
Description:
Zayo (ADB Companies) to install conduit/fiber along City of Tucson ROW for an estimated 5,024 LF. Zayo Handholes to be installed every 2,000 LF. New Permit submittal for expired permit TR-UTL-0226-00226.

Permit Reviews

Permit Number - TR-UTL-0626-00949
Permit Status: Fees due
Permit Description: Zayo (ADB Companies) to install conduit/fiber along City of Tucson ROW for an estimated 5,024 LF. Zayo Handholes to be installed every 2,000 LF. New Permit submittal for expired permit TR-UTL-0226-00226.
Start Date Submittal Complete Date Status  
06/05/2026 RIGHT-OF-WAY REVIEW v.1 06/22/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00949
Permit Status: Fees due
Permit Description: Zayo (ADB Companies) to install conduit/fiber along City of Tucson ROW for an estimated 5,024 LF. Zayo Handholes to be installed every 2,000 LF. New Permit submittal for expired permit TR-UTL-0226-00226.
Total Outstanding Activity Conditions - 10
Date Name
06/11/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/11/2026 Traffic control set-up approved between 9AM - 3:30PM
06/11/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/11/2026 3RD AVE IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
06/11/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/11/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/16/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
06/16/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
06/16/2026 Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post.
06/18/2026 No pedestrian detour is proposed. Therefore, the sidewalk shall remain open and ADA compliant at all times during construction. Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented prior to sidewalk closure