Permit: TR-UTL-0626-00935
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
859 W BUDMOORE TE
Address NEW:
859 W BUDMOORE TE
Apply Date:
06/02/2026
Applicant:
Austin Eslick
Description:
T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR. 09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0626-00935
Permit Status: Complete
Permit Description: T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR.
09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26.
Before 07/01/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/03/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/05/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00935
Permit Status: Complete
Permit Description: T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR.
09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26.
Before 07/01/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/05/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 06/05/2026 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 06/05/2026 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 06/05/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 06/05/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 06/05/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0626-00935
Permit Description: T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR.
09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26.
Before 07/01/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work already completed on this in the south alley south of Bud more there's still work to be done in the north alley north of Bud Moore. They will finish that up by the end of September. | |
| 09/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work already completed on this in the south alley south of Bud more there's still work to be done in the north alley north of Bud Moore. They will finish that up by the end of September. | |
| 09/04/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work already completed on this in the south alley south of Bud more there's still work to be done in the north alley north of Bud Moore. They will finish that up by the end of September. | |
| 09/30/2026 | TRSP - ROW - Final | Passed | Yes all worked completed for this permit |