Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
859 W BUDMOORE TE
Apply Date:
06/02/2026
Applicant:
Austin Eslick
Description:
T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR. 09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0626-00935
Permit Status: Complete
Permit Description: T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR. 09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
06/03/2026 RIGHT-OF-WAY REVIEW v.1 06/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00935
Permit Status: Complete
Permit Description: T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR. 09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 6
Date Name
06/05/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
06/05/2026 Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
06/05/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
06/05/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
06/05/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
06/05/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0626-00935
Permit Description: T159494 - Replace (21) existing TEP/TELCO distribution poles, (7) downguy assemblies, (2) spanguy assemblies, install (2) downguy assemblies, replace OH conductors, OH attachments, and OH transformers in alleyways to meet current TEP standards per Memo 2024C016- MIRACLE MANOR. 09/02/26- renew permit for 30 days as of 09/10/26 new expiration date is 10/10/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/04/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work already completed on this in the south alley south of Bud more there's still work to be done in the north alley north of Bud Moore. They will finish that up by the end of September.
09/04/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work already completed on this in the south alley south of Bud more there's still work to be done in the north alley north of Bud Moore. They will finish that up by the end of September.
09/04/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Work already completed on this in the south alley south of Bud more there's still work to be done in the north alley north of Bud Moore. They will finish that up by the end of September.
09/30/2026 TRSP - ROW - Final Passed Yes all worked completed for this permit

Documents

File Name Document Type  
DB 72595 - 859 W BUDMOORE TERRACE - FLAGGER VARIOUS - T159494_V1.PDF DOCUMENTS VIEW
T159494 DPH5 - PERMIT MAP_V1.PDF DOCUMENTS VIEW