Permit: TR-UTL-0626-00920
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2340 W 36TH ST
Address NEW:
2340 W 36TH ST
Apply Date:
06/01/2026
Applicant:
Antonio Lopez - National Barricade Company
Description:
Southwest Gas (SWG) crews will be potholing unlocatable gas lines. Crews will be digging up service to main connection and reconnecting wires.
Permit Reviews
Permit Number - TR-UTL-0626-00920
Permit Status: Inspections
Permit Description: Southwest Gas (SWG) crews will be potholing
unlocatable gas lines. Crews will be digging up
service to main connection and reconnecting
wires.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/05/2026 | REQUIRES RESUBMIT |
| 06/09/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/10/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00920
Permit Status: Inspections
Permit Description: Southwest Gas (SWG) crews will be potholing
unlocatable gas lines. Crews will be digging up
service to main connection and reconnecting
wires.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/04/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/10/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 06/10/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 06/10/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, § 1, 10-19-64) |
| 06/10/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0626-00920
Permit Description: Southwest Gas (SWG) crews will be potholing
unlocatable gas lines. Crews will be digging up
service to main connection and reconnecting
wires.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/29/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/29/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed |