Permit: TR-UTL-0626-00919
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2475 N HASKELL DR
Address NEW:
2475 N HASKELL DR
Apply Date:
06/01/2026
Applicant:
National Barricade LLC.
Description:
PRJ316325-1: Cox to overlash 877' of existing CATV fiber & bore 125' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0626-00919
Permit Status: Issued
Permit Description: PRJ316325-1: Cox to overlash 877' of existing CATV fiber & bore 125' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/08/2026 | REQUIRES RESUBMIT |
| 06/12/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00919
Permit Status: Issued
Permit Description: PRJ316325-1: Cox to overlash 877' of existing CATV fiber & bore 125' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 06/05/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/05/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 06/05/2026 | N HASKELL DR is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting. |
| 06/05/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/26/2026 | E GRANT RD is under a pavement moratorium. Any disturbance of existing asphalt shall require a 2-inch mill and overlay for a minimum of 25 feet in each direction from the outside edge of the cut, across all affected travel lanes. |
| 06/26/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 06/26/2026 | Shall coordinate with existing Grant Rd widening project and traffic control in the area. Contact City of Tucson Project Manager Rob Lane @main 520.791.3154 direct/mobile 520.400.3496 |