Permit: TR-UTL-0626-00919
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
2475 N HASKELL DR
Address NEW:
2475 N HASKELL DR
Apply Date:
06/01/2026
Applicant:
Cox Communications
Description:
PRJ316325-1: Cox to overlash 877' of existing CATV fiber & bore 125' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0626-00919
Permit Status: In review
Permit Description: PRJ316325-1: Cox to overlash 877' of existing CATV fiber & bore 125' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/08/2026 | REQUIRES RESUBMIT |
| 06/12/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00919
Permit Status: In review
Permit Description: PRJ316325-1: Cox to overlash 877' of existing CATV fiber & bore 125' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/05/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/05/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 06/05/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 06/05/2026 | Traffic control set-up approved between 9AM - 3:30PM |