Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
3050 E MILBER ST
Address NEW:
3050 E MILBER ST
Apply Date:
06/01/2026
Applicant:
Angeline Trejo
Description:
P.365196 - Within the City of Tucson ROW (West of Centerline), this project will bore 3-4" ducts 767'. Trench 1-2" duct for 62' with 39 linear feet of asphalt removal and replacement (approx 156 sq ft). This project is being done to clear conflicts with Pinal County project Country Club Rd, Michigan St to District St.

Permit Reviews

Permit Number - TR-UTL-0626-00911
Permit Status: Needs resubmittal
Permit Description: P.365196 - Within the City of Tucson ROW (West of Centerline), this project will bore 3-4" ducts 767'. Trench 1-2" duct for 62' with 39 linear feet of asphalt removal and replacement (approx 156 sq ft). This project is being done to clear conflicts with Pinal County project Country Club Rd, Michigan St to District St.
Start Date Submittal Complete Date Status  
06/01/2026 RIGHT-OF-WAY REVIEW v.1 06/15/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00911
Permit Status: Needs resubmittal
Permit Description: P.365196 - Within the City of Tucson ROW (West of Centerline), this project will bore 3-4" ducts 767'. Trench 1-2" duct for 62' with 39 linear feet of asphalt removal and replacement (approx 156 sq ft). This project is being done to clear conflicts with Pinal County project Country Club Rd, Michigan St to District St.
Total Outstanding Activity Conditions - 5
Date Name
06/03/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/03/2026 Traffic control set-up approved between 9AM - 3:30PM
06/03/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/03/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/03/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.