Permit: TR-UTL-0626-00910
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
267 E JACINTO ST
Address NEW:
267 E JACINTO ST
Apply Date:
06/01/2026
Applicant:
Rene Villalobos
Description:
wo3292627 267 e jacinto st 13 13 36 se service renewal eastside of lot in asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0626-00910
Permit Status: Complete
Permit Description: wo3292627 267 e jacinto st 13 13 36 se service renewal eastside of lot in asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00910
Permit Status: Complete
Permit Description: wo3292627 267 e jacinto st 13 13 36 se service renewal eastside of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/02/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/02/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/02/2026 | ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 06/02/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/02/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0626-00910
Permit Description: wo3292627 267 e jacinto st 13 13 36 se service renewal eastside of lot in asphalt 6LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/04/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/04/2026 | TRSP - ROW - Final | Passed |