Permit: TR-UTL-0625-01035
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5555 E 26TH ST
Address NEW:
5555 E 26TH ST
Apply Date:
06/30/2025
Applicant:
Tucson Electric Power
Description:
WOs T151505 & T25042. Install 45’ steel pole, 1 – OH XFMR, complete 6” primary riser, install cable in existing conduit. 10/24/2025- Renew for 30 days as of 10/26/2025, new expiration date is 11/25/2025.
Permit Reviews
Permit Number - TR-UTL-0625-01035
Permit Status: Complete
Permit Description: WOs T151505 & T25042. Install 45’ steel pole, 1 – OH XFMR, complete 6” primary riser, install cable in existing conduit.
10/24/2025- Renew for 30 days as of 10/26/2025, new expiration date is 11/25/2025.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-01035
Permit Status: Complete
Permit Description: WOs T151505 & T25042. Install 45’ steel pole, 1 – OH XFMR, complete 6” primary riser, install cable in existing conduit.
10/24/2025- Renew for 30 days as of 10/26/2025, new expiration date is 11/25/2025.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/01/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 07/01/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-01035
Permit Description: WOs T151505 & T25042. Install 45’ steel pole, 1 – OH XFMR, complete 6” primary riser, install cable in existing conduit.
10/24/2025- Renew for 30 days as of 10/26/2025, new expiration date is 11/25/2025.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is now complete | |
| 10/27/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 10/27/2025 | TRSP - ROW - Final | Passed | Work is complete |