Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1000 E 22ND ST BLDG 1
Apply Date:
06/30/2025
Applicant:
Angeline Trejo
Description:
P.322456- ACCESS EXISTING MH 12181 and HH 1329 FOR SPLICING, BORE NEW FP WITH 72CT MFIBER FROM HH 1329 TO BORE PIT, (4') and FROM BORE PIT TO MATCHLINE (303'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 1798 (122') AND FROM NEW 3048 HH TO MATCHLINE (172'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 2335 (362').

Permit Reviews

Permit Number - TR-UTL-0625-01034
Permit Status: Complete
Permit Description: P.322456- ACCESS EXISTING MH 12181 and HH 1329 FOR SPLICING, BORE NEW FP WITH 72CT MFIBER FROM HH 1329 TO BORE PIT, (4') and FROM BORE PIT TO MATCHLINE (303'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 1798 (122') AND FROM NEW 3048 HH TO MATCHLINE (172'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 2335 (362').
Start Date Submittal Complete Date Status  
07/01/2025 RIGHT-OF-WAY REVIEW v.1 07/01/2025 APPROVED Review Details
08/12/2025 RIGHT-OF-WAY REVIEW REVISION v.1 08/13/2025 REQUIRES RESUBMIT Review Details
08/22/2025 RIGHT-OF-WAY REVIEW REVISION v.3 08/22/2025 APPROVED Review Details
08/20/2025 RIGHT-OF-WAY REVIEW REVISION v.2 08/21/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-01034
Permit Status: Complete
Permit Description: P.322456- ACCESS EXISTING MH 12181 and HH 1329 FOR SPLICING, BORE NEW FP WITH 72CT MFIBER FROM HH 1329 TO BORE PIT, (4') and FROM BORE PIT TO MATCHLINE (303'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 1798 (122') AND FROM NEW 3048 HH TO MATCHLINE (172'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 2335 (362').
Total Outstanding Activity Conditions - 6
Date Name
07/01/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
07/01/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
07/01/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D
07/01/2025 Traffic control set-up approved between 9AM - 3:30PM
07/01/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.
07/01/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-01034
Permit Description: P.322456- ACCESS EXISTING MH 12181 and HH 1329 FOR SPLICING, BORE NEW FP WITH 72CT MFIBER FROM HH 1329 TO BORE PIT, (4') and FROM BORE PIT TO MATCHLINE (303'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 1798 (122') AND FROM NEW 3048 HH TO MATCHLINE (172'). BORE NEW FP WITH 72CT MFIBER FROM MATCHLINE TO NEW 3048 HH 2335 (362').
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/31/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/06/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/06/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/06/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.322456_CAD_REV0_06112025_TUCSON_V1.PDF DOCUMENTS VIEW
P.322456_SATELLITE VIEW_TUCSON_06112025_V1.PDF DOCUMENTS VIEW
QWS33070_V1.PDF DOCUMENTS VIEW