Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4766 E SPEEDWAY BL
Apply Date:
06/27/2025
Applicant:
Chelsey Bolinger
Description:
P.099101B (KAHNA) - PLACE 1278’ OF FIBER CABLE EXISTING CONDUIT

Permit Reviews

Permit Number - TR-UTL-0625-01017
Permit Status: Complete
Permit Description: P.099101B (KAHNA) - PLACE 1278’ OF FIBER CABLE EXISTING CONDUIT
Start Date Submittal Complete Date Status  
06/27/2025 RIGHT-OF-WAY REVIEW v.1 07/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-01017
Permit Status: Complete
Permit Description: P.099101B (KAHNA) - PLACE 1278’ OF FIBER CABLE EXISTING CONDUIT
Total Outstanding Activity Conditions - 2
Date Name
06/27/2025 PRE-CON/SIDEWALK
06/27/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-01017
Permit Description: P.099101B (KAHNA) - PLACE 1278’ OF FIBER CABLE EXISTING CONDUIT
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/16/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/16/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/16/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/17/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.099101B_AERIAL MAP_06272025_V1.PDF DOCUMENTS VIEW
P.099101B_CAD_06272025_V1.PDF DOCUMENTS VIEW
P.099101B_TCP_06272025_V1.PDF DOCUMENTS VIEW