Permit: TR-UTL-0625-01016
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
944 W NEARMONT DR
Address NEW:
944 W NEARMONT DR
Apply Date:
06/27/2025
Applicant:
Andrea Robins
Description:
EXCAVATING A 3X3 BELL HOLE AT ***944 W. NEARMONT DR. TO ABANDON GAS SERVICE IN ROW IN ASPHALT AND DIRT. BELL HOLE WILL BE LOCATED APPROX 6' FROM SOUTH PROPERTY LINE, NO TRAFFIC CONTROL WILL BE REQUIRED(CREW WILL USE ON BOARD CONSTRUCTION AHEAD SIGNS), WORK IS OFF ROADWAY AND WILL NOT DISTURB TRAFFIC FLOW.
Permit Reviews
Permit Number - TR-UTL-0625-01016
Permit Status: Complete
Permit Description: EXCAVATING A 3X3 BELL HOLE AT ***944 W. NEARMONT DR. TO ABANDON GAS SERVICE IN ROW IN ASPHALT AND DIRT. BELL HOLE WILL BE LOCATED APPROX 6' FROM SOUTH PROPERTY LINE, NO TRAFFIC CONTROL WILL BE REQUIRED(CREW WILL USE ON BOARD CONSTRUCTION AHEAD SIGNS), WORK IS OFF ROADWAY AND WILL NOT DISTURB TRAFFIC FLOW.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/27/2025 | REQUIRES RESUBMIT |
| 08/04/2025 | RIGHT-OF-WAY REVIEW v.2 | 08/18/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-01016
Permit Status: Complete
Permit Description: EXCAVATING A 3X3 BELL HOLE AT ***944 W. NEARMONT DR. TO ABANDON GAS SERVICE IN ROW IN ASPHALT AND DIRT. BELL HOLE WILL BE LOCATED APPROX 6' FROM SOUTH PROPERTY LINE, NO TRAFFIC CONTROL WILL BE REQUIRED(CREW WILL USE ON BOARD CONSTRUCTION AHEAD SIGNS), WORK IS OFF ROADWAY AND WILL NOT DISTURB TRAFFIC FLOW.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/04/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 08/04/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 08/04/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-01016
Permit Description: EXCAVATING A 3X3 BELL HOLE AT ***944 W. NEARMONT DR. TO ABANDON GAS SERVICE IN ROW IN ASPHALT AND DIRT. BELL HOLE WILL BE LOCATED APPROX 6' FROM SOUTH PROPERTY LINE, NO TRAFFIC CONTROL WILL BE REQUIRED(CREW WILL USE ON BOARD CONSTRUCTION AHEAD SIGNS), WORK IS OFF ROADWAY AND WILL NOT DISTURB TRAFFIC FLOW.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/18/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/18/2025 | TRSP - ROW - Final | Passed |