Permit: TR-UTL-0625-01012
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4602 S 11TH AV
Address NEW:
4602 S 11TH AV
Apply Date:
06/26/2025
Applicant:
Chelsey Bolinger
Description:
P.169082A (KAHNA) - TRENCH 17’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE.
Permit Reviews
Permit Number - TR-UTL-0625-01012
Permit Status: Complete
Permit Description: P.169082A (KAHNA) - TRENCH 17’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/26/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-01012
Permit Status: Complete
Permit Description: P.169082A (KAHNA) - TRENCH 17’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/26/2025 | ALLEY |
| 06/26/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 06/26/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 06/26/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/26/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-01012
Permit Description: P.169082A (KAHNA) - TRENCH 17’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/15/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/15/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/15/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/15/2025 | TRSP - ROW - Final | Passed |