Permit: TR-UTL-0625-00994
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
766 W UTAH ST
Address NEW:
766 W UTAH ST
Apply Date:
06/23/2025
Applicant:
Chelsey Bolinger
Description:
P.169123 (KAHNA) - TRENCH 24’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE. OVERLASH 1,759’ OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0625-00994
Permit Status: Complete
Permit Description: P.169123 (KAHNA) - TRENCH 24’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE. OVERLASH 1,759’ OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/23/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-00994
Permit Status: Complete
Permit Description: P.169123 (KAHNA) - TRENCH 24’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE. OVERLASH 1,759’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/23/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 06/23/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00994
Permite Description: P.169123 (KAHNA) - TRENCH 24’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE. OVERLASH 1,759’ OF AERIAL FIBER CABLE.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00994
Permit Description: P.169123 (KAHNA) - TRENCH 24’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE. OVERLASH 1,759’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 10/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/01/2026 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/01/2026 | TRSP - ROW - Final | Passed |