Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1880 E COPPER ST
Address NEW:
1880 E COPPER ST
Apply Date:
06/23/2025
Applicant:
ANGEL MORALES
Description:
wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc

Permit Reviews

Permit Number - TR-UTL-0625-00993
Permit Status: Complete
Permit Description: wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc
Start Date Submittal Complete Date Status  
06/23/2025 RIGHT-OF-WAY REVIEW v.1 06/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00993
Permit Status: Complete
Permit Description: wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 5
Date Name
06/23/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/23/2025 Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
06/23/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
06/23/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
06/23/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00993
Permit Description: wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/29/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/29/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/29/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
12/08/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1880 E COPPER ST_C SKETCH_V1.PDF DOCUMENTS VIEW
1880 E COPPER ST_TCP_V1.PDF DOCUMENTS VIEW