Permit: TR-UTL-0625-00993
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1880 E COPPER ST
Address NEW:
1880 E COPPER ST
Apply Date:
06/23/2025
Applicant:
ANGEL MORALES
Description:
wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0625-00993
Permit Status: Complete
Permit Description: wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/23/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-00993
Permit Status: Complete
Permit Description: wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/23/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/23/2025 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 06/23/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 06/23/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 06/23/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00993
Permit Description: wo3063861 1880 e copper st 14-13-32 sw main repair front north side of lot in asphalt 6LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/29/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/08/2025 | TRSP - ROW - Final | Passed |