Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2300 S SAN JOAQUIN AV
Apply Date:
06/20/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop for crews to install gas anodes on facilities

Permit Reviews

Permit Number - TR-UTL-0625-00987
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in dirt/blktop for crews to install gas anodes on facilities
Start Date Submittal Complete Date Status  
06/21/2025 RIGHT-OF-WAY REVIEW v.1 06/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00987
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in dirt/blktop for crews to install gas anodes on facilities
Total Outstanding Activity Conditions - 2
Date Name
06/23/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
06/23/2025 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0625-00987
Permite Description: 2 5x5 bellholes in dirt/blktop for crews to install gas anodes on facilities
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/22/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
08/22/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0625-00987
Permit Description: 2 5x5 bellholes in dirt/blktop for crews to install gas anodes on facilities
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/25/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/22/2025 TRSP - ROW - Barricade - Setup/Routine Passed