Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0625-00981
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3401 E GRANT RD
Address NEW:
3401 E GRANT RD
Apply Date:
06/19/2025
Applicant:
Briana Castro
Description:
Relocation near 3409 E Grant Rd (Lat: 32° 15' 3.90", Long: -110° 55' 11.40". Linear distance for the fiber below is approximately 306'. 600' to UG.
Permit Reviews
Permit Number - TR-UTL-0625-00981
Permit Status: Complete
Permit Description: Relocation near 3409 E Grant Rd (Lat: 32° 15' 3.90", Long: -110° 55' 11.40". Linear distance for the fiber below is approximately 306'. 600' to UG.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/24/2025 | REQUIRES RESUBMIT |
| 06/24/2025 | RIGHT-OF-WAY REVIEW v.2 | 06/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-00981
Permit Status: Complete
Permit Description: Relocation near 3409 E Grant Rd (Lat: 32° 15' 3.90", Long: -110° 55' 11.40". Linear distance for the fiber below is approximately 306'. 600' to UG.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/23/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/23/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/23/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/24/2025 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 06/24/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 06/24/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00981
Permit Description: Relocation near 3409 E Grant Rd (Lat: 32° 15' 3.90", Long: -110° 55' 11.40". Linear distance for the fiber below is approximately 306'. 600' to UG.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/28/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 08/28/2025 | TRSP - ROW - Final | Passed |