Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
961 N CATALINA AV
Apply Date:
06/17/2025
Applicant:
Chelsey Bolinger
Description:
P.099101 (KAHNA) - BORE 590’ & TRENCH 116’’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (09) HANDHOLES & PEDESTALS. OVERLASH 1,054’ OF AERIAL FIBER CABLE.

Permit Reviews

Permit Number - TR-UTL-0625-00973
Permit Status: Complete
Permit Description: P.099101 (KAHNA) - BORE 590’ & TRENCH 116’’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (09) HANDHOLES & PEDESTALS. OVERLASH 1,054’ OF AERIAL FIBER CABLE.
Start Date Submittal Complete Date Status  
06/27/2025 RIGHT-OF-WAY REVIEW v.2 07/01/2025 APPROVED Review Details
06/17/2025 RIGHT-OF-WAY REVIEW v.1 06/18/2025 REQUIRES RESUBMIT Review Details
08/13/2025 RIGHT-OF-WAY REVIEW REVISION v.1 08/15/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00973
Permit Status: Complete
Permit Description: P.099101 (KAHNA) - BORE 590’ & TRENCH 116’’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (09) HANDHOLES & PEDESTALS. OVERLASH 1,054’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 5
Date Name
06/18/2025 BUS STOP/ ROUTE
06/18/2025 PRE-CON/PAVEMENT/SIDEWALK
06/18/2025 Traffic Control set-up approved between 7AM - 5PM
06/18/2025 Traffic control set-up approved between 9AM - 3:30PM
06/18/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00973
Permite Description: P.099101 (KAHNA) - BORE 590’ & TRENCH 116’’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (09) HANDHOLES & PEDESTALS. OVERLASH 1,054’ OF AERIAL FIBER CABLE.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/09/2025 TRSP - ROW - Barricade Takedown N/A Re-inspection required
10/09/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
05/07/2026 TRSP - ROW - Final N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00973
Permit Description: P.099101 (KAHNA) - BORE 590’ & TRENCH 116’’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (09) HANDHOLES & PEDESTALS. OVERLASH 1,054’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/08/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/09/2025 TRSP - ROW - Barricade - Setup/Routine Passed
05/07/2026 TRSP - ROW - Barricade Takedown Passed
05/07/2026 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.099101A AERIAL MAP_V1.PDF DOCUMENTS VIEW
P.099101A_CAD REV1_08122025_V1.PDF DOCUMENTS VIEW
P.099101A_TCP REV1_08122025_V1.PDF DOCUMENTS VIEW
REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.099101A_AERIAL MAP REV1_06272025_V2.PDF DOCUMENTS VIEW
P.099101A_CAD REV1_06272025_V2.PDF DOCUMENTS VIEW
P.099101A_TCP REV1_06272025_V2.PDF DOCUMENTS VIEW