Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1740 E FORT LOWELL RD
Apply Date:
06/17/2025
Applicant:
Cox Communications
Description:
PRJ295919-1 cox to trench 4' and bore 72' to install conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-0625-00971
Permit Status: Complete
Permit Description: PRJ295919-1 cox to trench 4' and bore 72' to install conduit for system tie.
Start Date Submittal Complete Date Status  
06/17/2025 RIGHT-OF-WAY REVIEW v.1 06/18/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00971
Permit Status: Complete
Permit Description: PRJ295919-1 cox to trench 4' and bore 72' to install conduit for system tie.
Total Outstanding Activity Conditions - 5
Date Name
06/17/2025 PRE-CON/PAVEMENT/SIDEWALK
06/17/2025 Traffic control set-up approved between 9AM - 3:30PM
06/18/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
06/18/2025 OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP
06/18/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00971
Permit Description: PRJ295919-1 cox to trench 4' and bore 72' to install conduit for system tie.
Total Completed Inspections - 5
Date Description Inspector Results Comments
07/07/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/16/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/17/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
07/22/2025 TRSP - ROW - Barricade Takedown Passed
08/04/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
BI-640021_PRJ295919-1 TCP_V1.PDF DOCUMENTS VIEW
PRJ295919-1_TUSCON_V1.PDF DOCUMENTS VIEW