Permit: TR-UTL-0625-00950
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1677 S RESEARCH LP
Address NEW:
1677 S RESEARCH LP
Apply Date:
06/12/2025
Applicant:
Cox Communications
Description:
PRJ295606-1 Cox to bore 51' to install new conduit for system tie and pull 376' through existing conduit
Permit Reviews
Permit Number - TR-UTL-0625-00950
Permit Status: Complete
Permit Description: PRJ295606-1 Cox to bore 51' to install new conduit for system tie and pull 376' through existing conduit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/12/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/13/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-00950
Permit Status: Complete
Permit Description: PRJ295606-1 Cox to bore 51' to install new conduit for system tie and pull 376' through existing conduit
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/12/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/12/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/13/2025 | Survey Monument |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00950
Permit Description: PRJ295606-1 Cox to bore 51' to install new conduit for system tie and pull 376' through existing conduit
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Francisco over the phone and he told me that Monday 7-7-25 would be an estimated start date. | |
| 08/01/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete | |
| 08/01/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 08/07/2025 | TRSP - ROW - Final | Passed | Work is complete |