Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1925 S MARC DR
Address NEW:
1925 S MARC DR
Apply Date:
06/12/2025
Applicant:
Tucson Electric Power
Description:
AFTER-THE-FACT. WO T141699. TEP replaced poles as Priority 2 work: Replaced (5) Poles, Replaced (3) Overhead Transformers, Replaced (2) anchors w/ guys. Replaced (2) 5/16" Guy Wires, reused existing anchors. Replaced overhead secondary conductor from open wire to parallel.

Permit Reviews

Permit Number - TR-UTL-0625-00948
Permit Status: Complete
Permit Description: AFTER-THE-FACT. WO T141699. TEP replaced poles as Priority 2 work: Replaced (5) Poles, Replaced (3) Overhead Transformers, Replaced (2) anchors w/ guys. Replaced (2) 5/16" Guy Wires, reused existing anchors. Replaced overhead secondary conductor from open wire to parallel.
Start Date Submittal Complete Date Status  
06/12/2025 RIGHT-OF-WAY REVIEW v.1 06/12/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00948
Permit Status: Complete
Permit Description: AFTER-THE-FACT. WO T141699. TEP replaced poles as Priority 2 work: Replaced (5) Poles, Replaced (3) Overhead Transformers, Replaced (2) anchors w/ guys. Replaced (2) 5/16" Guy Wires, reused existing anchors. Replaced overhead secondary conductor from open wire to parallel.
Total Outstanding Activity Conditions - 2
Date Name
06/12/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
06/12/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00948
Permit Description: AFTER-THE-FACT. WO T141699. TEP replaced poles as Priority 2 work: Replaced (5) Poles, Replaced (3) Overhead Transformers, Replaced (2) anchors w/ guys. Replaced (2) 5/16" Guy Wires, reused existing anchors. Replaced overhead secondary conductor from open wire to parallel.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/08/2025 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
AERIAL-MAP-WO_T141699_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW