Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2600 E LEE ST
Address NEW:
2600 E LEE ST
Apply Date:
06/10/2025
Applicant:
Andrew Ruiz
Description:
Remove and replace Like for like Concrete, Sewer bench rehab, CIPP Lining.

Permit Reviews

Permit Number - TR-UTL-0625-00935
Permit Status: Complete
Permit Description: Remove and replace Like for like Concrete, Sewer bench rehab, CIPP Lining.
Start Date Submittal Complete Date Status  
06/17/2025 RIGHT-OF-WAY REVIEW v.3 06/17/2025 APPROVED Review Details
06/10/2025 RIGHT-OF-WAY REVIEW v.1 06/11/2025 REQUIRES RESUBMIT Review Details
06/16/2025 RIGHT-OF-WAY REVIEW v.2 06/16/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00935
Permit Status: Complete
Permit Description: Remove and replace Like for like Concrete, Sewer bench rehab, CIPP Lining.
Total Outstanding Activity Conditions - 4
Date Name
06/11/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
06/11/2025 Traffic control set-up approved between 9AM - 3:30PM
06/17/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.
06/17/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00935
Permit Description: Remove and replace Like for like Concrete, Sewer bench rehab, CIPP Lining.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/11/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/11/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/11/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
2600 E LEE ST. -TC MOCK UP JB_V1.PDF DOCUMENTS VIEW
ACHEN GARDNER - 2600 E LEE ST - FOOTBALL - SHOULDER CL PLAN 3 - 124063_V3.PDF DOCUMENTS VIEW
ACHEN GARDNER - 2600 E LEE ST - FOOTBALL CL PLAN 2 - 124063_V1.PDF DOCUMENTS VIEW