Permit: TR-UTL-0625-00911
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1737 N LOUIS LN
Address NEW:
1737 N LOUIS LN
Apply Date:
06/06/2025
Applicant:
Chelsey Bolinger
Description:
P.099108A (KAHNA) - BORE 1,807’ & TRENCH 57’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (8) HANDHOLES & PEDESTALS. OVERLASH 2,436’ OF AERIAL FIBER CABLE. 9/3/25- RENEWAL FOR 60 DAYS AS OF 9/23/25
Permit Reviews
Permit Number - TR-UTL-0625-00911
Permit Status: Complete
Permit Description: P.099108A (KAHNA) - BORE 1,807’ & TRENCH 57’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (8) HANDHOLES & PEDESTALS. OVERLASH 2,436’ OF AERIAL FIBER CABLE.
9/3/25- RENEWAL FOR 60 DAYS AS OF 9/23/25
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/09/2025 | REQUIRES RESUBMIT |
| 06/17/2025 | RIGHT-OF-WAY REVIEW v.2 | 06/18/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-00911
Permit Status: Complete
Permit Description: P.099108A (KAHNA) - BORE 1,807’ & TRENCH 57’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (8) HANDHOLES & PEDESTALS. OVERLASH 2,436’ OF AERIAL FIBER CABLE.
9/3/25- RENEWAL FOR 60 DAYS AS OF 9/23/25
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/06/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/06/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/18/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/18/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 06/18/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/18/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00911
Permit Description: P.099108A (KAHNA) - BORE 1,807’ & TRENCH 57’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (8) HANDHOLES & PEDESTALS. OVERLASH 2,436’ OF AERIAL FIBER CABLE.
9/3/25- RENEWAL FOR 60 DAYS AS OF 9/23/25
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/01/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/01/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/01/2025 | TRSP - ROW - Final | Passed |