Permit: TR-UTL-0625-00910
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1019 N NORTON AV
Address NEW:
1019 N NORTON AV
Apply Date:
06/06/2025
Applicant:
Carla Donaldson
Description:
EXCAVATING A 24X3 TRENCH TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE IN DIRT ALLY ON NORTH SIDE OF PROPERTY AND CROSSING NORTON AVE TO THE EAST
Permit Reviews
Permit Number - TR-UTL-0625-00910
Permit Status: Complete
Permit Description: EXCAVATING A 24X3 TRENCH TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE IN DIRT ALLY ON NORTH SIDE OF PROPERTY AND CROSSING NORTON AVE TO THE EAST
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2025 | RIGHT-OF-WAY REVIEW v.2 | 06/24/2025 | APPROVED |
| 06/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/06/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-00910
Permit Status: Complete
Permit Description: EXCAVATING A 24X3 TRENCH TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE IN DIRT ALLY ON NORTH SIDE OF PROPERTY AND CROSSING NORTON AVE TO THE EAST
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/06/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/06/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00910
Permit Description: EXCAVATING A 24X3 TRENCH TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE IN DIRT ALLY ON NORTH SIDE OF PROPERTY AND CROSSING NORTON AVE TO THE EAST
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/30/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/30/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/12/2025 | TRSP - ROW - Final | Passed |