Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/05/2025
Applicant:
JUAN PEREZ
Description:
Excavating a 2x2 bell hole to abandon gas line service in row in dirt 7/15/25- RENEWAL FOR 30 DAYS AS OF 7/12

Permit Reviews

Permit Number - TR-UTL-0625-00906
Permit Status: Complete
Permit Description: Excavating a 2x2 bell hole to abandon gas line service in row in dirt 7/15/25- RENEWAL FOR 30 DAYS AS OF 7/12
Start Date Submittal Complete Date Status  
06/09/2025 RIGHT-OF-WAY REVIEW v.2 06/09/2025 APPROVED Review Details
06/05/2025 RIGHT-OF-WAY REVIEW v.1 06/06/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00906
Permit Status: Complete
Permit Description: Excavating a 2x2 bell hole to abandon gas line service in row in dirt 7/15/25- RENEWAL FOR 30 DAYS AS OF 7/12
Total Outstanding Activity Conditions - 5
Date Name
06/05/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
06/05/2025 Approved for Work within City of Tucson Right of Way Only..Pima County permits will be required for work in and Traffic Control within Pima ROW
06/05/2025 Traffic control set-up approved between 9AM - 3:30PM
06/09/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/09/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00906
Permite Description: Excavating a 2x2 bell hole to abandon gas line service in row in dirt 7/15/25- RENEWAL FOR 30 DAYS AS OF 7/12
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/12/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00906
Permit Description: Excavating a 2x2 bell hole to abandon gas line service in row in dirt 7/15/25- RENEWAL FOR 30 DAYS AS OF 7/12
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/11/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/11/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
09/02/2025 TRSP - ROW - Final Passed