Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2250 E COPPER ST
Address NEW:
2250 E COPPER ST
Apply Date:
06/05/2025
Applicant:
Rene Villalobos
Description:
work order 3050821, 2250 e copper st 13-14-32, repair leaking main at the north side of the lot in asphalt and dirt, 6lf. ca

Permit Reviews

Permit Number - TR-UTL-0625-00901
Permit Status: Complete
Permit Description: work order 3050821, 2250 e copper st 13-14-32, repair leaking main at the north side of the lot in asphalt and dirt, 6lf. ca
Start Date Submittal Complete Date Status  
06/05/2025 RIGHT-OF-WAY REVIEW v.1 06/05/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0625-00901
Permit Status: Complete
Permit Description: work order 3050821, 2250 e copper st 13-14-32, repair leaking main at the north side of the lot in asphalt and dirt, 6lf. ca
Total Outstanding Activity Conditions - 3
Date Name
06/05/2025 PRE-CON/PAVEMENT/SIDEWALK
06/05/2025 Traffic Control set-up approved between 7AM - 5PM
06/05/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00901
Permite Description: work order 3050821, 2250 e copper st 13-14-32, repair leaking main at the north side of the lot in asphalt and dirt, 6lf. ca
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/11/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0625-00901
Permit Description: work order 3050821, 2250 e copper st 13-14-32, repair leaking main at the north side of the lot in asphalt and dirt, 6lf. ca
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/08/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
12/08/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
2250 E COPPER ST_SKETCH_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW