Permit: TR-UTL-0625-00897
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
408 E 16TH ST
Address NEW:
408 E 16TH ST
Apply Date:
06/04/2025
Applicant:
Carla Donaldson
Description:
EXCAVATING A 40X3 TRENCH IN DIRT BEHIND CURB TO REPLACE GAS LINE (THE PLAN IS THIS WILL BE A BORE JOB SO HOPEFULLY NO TRENCHING WITH THE EXCEPTION OF THE BORE HOLE WILL BE DONE, JUST PLANNING FOR THE BIGGER TRENCH IF NECESSARY)
Permit Reviews
Permit Number - TR-UTL-0625-00897
Permit Status: Complete
Permit Description: EXCAVATING A 40X3 TRENCH IN DIRT BEHIND CURB TO REPLACE GAS LINE (THE PLAN IS THIS WILL BE A BORE JOB SO HOPEFULLY NO TRENCHING WITH THE EXCEPTION OF THE BORE HOLE WILL BE DONE, JUST PLANNING FOR THE BIGGER TRENCH IF NECESSARY)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0625-00897
Permit Status: Complete
Permit Description: EXCAVATING A 40X3 TRENCH IN DIRT BEHIND CURB TO REPLACE GAS LINE (THE PLAN IS THIS WILL BE A BORE JOB SO HOPEFULLY NO TRENCHING WITH THE EXCEPTION OF THE BORE HOLE WILL BE DONE, JUST PLANNING FOR THE BIGGER TRENCH IF NECESSARY)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/05/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/05/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0625-00897
Permit Description: EXCAVATING A 40X3 TRENCH IN DIRT BEHIND CURB TO REPLACE GAS LINE (THE PLAN IS THIS WILL BE A BORE JOB SO HOPEFULLY NO TRENCHING WITH THE EXCEPTION OF THE BORE HOLE WILL BE DONE, JUST PLANNING FOR THE BIGGER TRENCH IF NECESSARY)
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/05/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/05/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/22/2025 | TRSP - ROW - Final | Passed |