Permit: TR-UTL-0624-01238
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7701 E LESTER ST
Address NEW:
7701 E LESTER ST
Apply Date:
06/28/2024
Applicant:
John Mussulman
Description:
wo 2797178 7701 e lester st 14-15-05 ne service repair north side of lot in dirt alley 5LF/sc
Permit Reviews
Permit Number - TR-UTL-0624-01238
Permit Status: Complete
Permit Description: wo 2797178 7701 e lester st 14-15-05 ne service repair north side of lot in dirt alley 5LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01238
Permit Status: Complete
Permit Description: wo 2797178 7701 e lester st 14-15-05 ne service repair north side of lot in dirt alley 5LF/sc
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 07/01/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/01/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 07/01/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01238
Permite Description: wo 2797178 7701 e lester st 14-15-05 ne service repair north side of lot in dirt alley 5LF/sc
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01238
Permit Description: wo 2797178 7701 e lester st 14-15-05 ne service repair north side of lot in dirt alley 5LF/sc
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/30/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/30/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed |