Permit: TR-UTL-0624-01234
Permit Details
Apply Date:
06/28/2024
Applicant:
Think Safety Inc
Description:
COX TO PULL THRU 91' OF EXISTING CONDUIT FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0624-01234
Permit Status: Complete
Permit Description: COX TO PULL THRU 91' OF EXISTING CONDUIT FOR SYSTEM TIE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01234
Permit Status: Complete
Permit Description: COX TO PULL THRU 91' OF EXISTING CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
06/28/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
06/28/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
06/28/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01234
Permit Description: COX TO PULL THRU 91' OF EXISTING CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
10/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/10/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
10/10/2024 | TRSP - ROW - Final/Close-Out | Passed |