Permit: TR-UTL-0624-01208
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1693 W GRANT RD
Address NEW:
1693 W GRANT RD
Apply Date:
06/24/2024
Applicant:
Cox Communications
Description:
COX TO BORE 58', TRENCH 20' AND OVERLASH 375' OF AERIAL FIBER FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0624-01208
Permit Status: Complete
Permit Description: COX TO BORE 58', TRENCH 20' AND OVERLASH 375' OF AERIAL FIBER FOR SYSTEM TIE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2024 | RIGHT-OF-WAY REVIEW v.2 | 06/27/2024 | APPROVED |
| 06/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/25/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01208
Permit Status: Complete
Permit Description: COX TO BORE 58', TRENCH 20' AND OVERLASH 375' OF AERIAL FIBER FOR SYSTEM TIE
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/24/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/24/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/24/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 06/24/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01208
Permit Description: COX TO BORE 58', TRENCH 20' AND OVERLASH 375' OF AERIAL FIBER FOR SYSTEM TIE
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/10/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 10/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/10/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 10/10/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/10/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 10/10/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 10/10/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 10/10/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |