Permit: TR-UTL-0624-01207
Permit Details
Apply Date:
06/24/2024
Applicant:
Vickie McCambridge
Description:
trenching 150ft north from existing node pedestal then bore 100ft West across N Bennan Venture to set new power supply.
Permit Reviews
Permit Number - TR-UTL-0624-01207
Permit Status: Complete
Permit Description: trenching 150ft north from existing node pedestal then bore 100ft West across N Bennan Venture to set new power supply.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01207
Permit Status: Complete
Permit Description: trenching 150ft north from existing node pedestal then bore 100ft West across N Bennan Venture to set new power supply.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/24/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
06/24/2024 | Traffic control set-up approved between 9AM - 3:30PM |
06/24/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
06/24/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01207
Permit Description: trenching 150ft north from existing node pedestal then bore 100ft West across N Bennan Venture to set new power supply.
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
08/29/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
08/29/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
11/18/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
08/29/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
11/18/2024 | TRSP - ROW - Final/Close-Out | Passed |