Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
5500 S NOGALES HY
Apply Date:
06/18/2024
Applicant:
Ilana Galluzzo
Description:
(3) 4' x 4' BELL HOLES IN DIRT WITH AN APPROX 2' x 200' TRENCH IN DIRT, AND AN APPROX. 2' x 830' TRENCH IN DIRT.

Permit Reviews

Permit Number - TR-UTL-0624-01163
Permit Status: Inspections
Permit Description: (3) 4' x 4' BELL HOLES IN DIRT WITH AN APPROX 2' x 200' TRENCH IN DIRT, AND AN APPROX. 2' x 830' TRENCH IN DIRT.
Start Date Submittal Complete Date Status  
06/18/2024 RIGHT-OF-WAY REVIEW v.1 06/25/2024 REQUIRES RESUBMIT Review Details
06/25/2024 RIGHT-OF-WAY REVIEW v.2 07/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0624-01163
Permit Status: Inspections
Permit Description: (3) 4' x 4' BELL HOLES IN DIRT WITH AN APPROX 2' x 200' TRENCH IN DIRT, AND AN APPROX. 2' x 830' TRENCH IN DIRT.
Total Outstanding Activity Conditions - 1
Date Name
06/18/2024 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0624-01163
Permite Description: (3) 4' x 4' BELL HOLES IN DIRT WITH AN APPROX 2' x 200' TRENCH IN DIRT, AND AN APPROX. 2' x 830' TRENCH IN DIRT.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/12/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Partial Pass

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0624-01163
Permit Description: (3) 4' x 4' BELL HOLES IN DIRT WITH AN APPROX 2' x 200' TRENCH IN DIRT, AND AN APPROX. 2' x 830' TRENCH IN DIRT.
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/08/2024 TRSP - ROW - Barricade - Setup/Routine Passed
08/08/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/08/2024 TRSP - ROW - Barricade Takedown Passed
10/08/2024 TRSP - ROW - Final/Close-Out Passed
08/04/2026 TRSP - ROW - Backfill - Placement/Compaction Passed