Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
615 W JACINTO ST
Address NEW:
615 W JACINTO ST
Apply Date:
06/14/2024
Applicant:
Cox Communications
Description:
EXPEDITE - PRJ272547-1 COX TO OVERLASH 288' AND TRENCH 15’ FT TO INSTALL NEW CATV CONDUIT AND PLACE NEW EQUIPMENT FOR SYSTEM TIE.

Permit Reviews

Permit Number - TR-UTL-0624-01150
Permit Status: Complete
Permit Description: EXPEDITE - PRJ272547-1 COX TO OVERLASH 288' AND TRENCH 15’ FT TO INSTALL NEW CATV CONDUIT AND PLACE NEW EQUIPMENT FOR SYSTEM TIE.
Start Date Submittal Complete Date Status  
06/17/2024 RIGHT-OF-WAY REVIEW v.1 06/25/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0624-01150
Permit Status: Complete
Permit Description: EXPEDITE - PRJ272547-1 COX TO OVERLASH 288' AND TRENCH 15’ FT TO INSTALL NEW CATV CONDUIT AND PLACE NEW EQUIPMENT FOR SYSTEM TIE.
Total Outstanding Activity Conditions - 6
Date Name
06/17/2024 PAVEMENT MORATORIUM
06/17/2024 PRE-CON/PAVEMENT/SIDEWALK
06/17/2024 PROP 411
06/17/2024 Traffic Control set-up approved between 7AM - 5PM
06/17/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/24/2024 ADA compliance setbacks

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0624-01150
Permit Description: EXPEDITE - PRJ272547-1 COX TO OVERLASH 288' AND TRENCH 15’ FT TO INSTALL NEW CATV CONDUIT AND PLACE NEW EQUIPMENT FOR SYSTEM TIE.
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/05/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/06/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed
09/06/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
09/09/2024 TRSP - ROW - AERIAL INSTALLATION Passed
09/27/2024 TRSP - ROW - Final/Close-Out Passed