Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/14/2024
Applicant:
Desert Barricades LLC
Description:
WOs T15407, T14541 & T84683. TEP TO PARK AND WORK IN THE ROW TO REMOVE 8 UTILITY POLES AND ASSOCIATED CONDUCTORS, FRAMING, ANCHORS, GUY WIRES, ETC. AND TRANSFER PRIMARY RISERS TO NEW J1 AND J2’s, COMPLETE (3) PBOXES, (2) PME9’s, AND (1) 6” FEEDER RISER, AND INSTALL (1) J1 AND TRANSFER PRIMARY RISER TO NEW J1 ON 3 WO’s T15407 (POLE REMOVAL), T14541 (FEEDER), AND T84683 (INSTALL NEW J1 AND TRANSFER EXISTING 2.5” RISER. Updated - 8/15/2024 - Request for Renewal/ Extention - Request for 30 day extension as of 8/23/2024..

Permit Reviews

Permit Number - TR-UTL-0624-01148
Permit Status: Complete
Permit Description: WOs T15407, T14541 & T84683. TEP TO PARK AND WORK IN THE ROW TO REMOVE 8 UTILITY POLES AND ASSOCIATED CONDUCTORS, FRAMING, ANCHORS, GUY WIRES, ETC. AND TRANSFER PRIMARY RISERS TO NEW J1 AND J2’s, COMPLETE (3) PBOXES, (2) PME9’s, AND (1) 6” FEEDER RISER, AND INSTALL (1) J1 AND TRANSFER PRIMARY RISER TO NEW J1 ON 3 WO’s T15407 (POLE REMOVAL), T14541 (FEEDER), AND T84683 (INSTALL NEW J1 AND TRANSFER EXISTING 2.5” RISER. Updated - 8/15/2024 - Request for Renewal/ Extention - Request for 30 day extension as of 8/23/2024..
Start Date Submittal Complete Date Status  
06/17/2024 RIGHT-OF-WAY REVIEW v.1 06/17/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0624-01148
Permit Status: Complete
Permit Description: WOs T15407, T14541 & T84683. TEP TO PARK AND WORK IN THE ROW TO REMOVE 8 UTILITY POLES AND ASSOCIATED CONDUCTORS, FRAMING, ANCHORS, GUY WIRES, ETC. AND TRANSFER PRIMARY RISERS TO NEW J1 AND J2’s, COMPLETE (3) PBOXES, (2) PME9’s, AND (1) 6” FEEDER RISER, AND INSTALL (1) J1 AND TRANSFER PRIMARY RISER TO NEW J1 ON 3 WO’s T15407 (POLE REMOVAL), T14541 (FEEDER), AND T84683 (INSTALL NEW J1 AND TRANSFER EXISTING 2.5” RISER. Updated - 8/15/2024 - Request for Renewal/ Extention - Request for 30 day extension as of 8/23/2024..
Total Outstanding Activity Conditions - 2
Date Name
06/17/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
06/17/2024 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0624-01148
Permite Description: WOs T15407, T14541 & T84683. TEP TO PARK AND WORK IN THE ROW TO REMOVE 8 UTILITY POLES AND ASSOCIATED CONDUCTORS, FRAMING, ANCHORS, GUY WIRES, ETC. AND TRANSFER PRIMARY RISERS TO NEW J1 AND J2’s, COMPLETE (3) PBOXES, (2) PME9’s, AND (1) 6” FEEDER RISER, AND INSTALL (1) J1 AND TRANSFER PRIMARY RISER TO NEW J1 ON 3 WO’s T15407 (POLE REMOVAL), T14541 (FEEDER), AND T84683 (INSTALL NEW J1 AND TRANSFER EXISTING 2.5” RISER. Updated - 8/15/2024 - Request for Renewal/ Extention - Request for 30 day extension as of 8/23/2024..
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/22/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required multiple calls and messages left 8-21 and 8-22. please reschedule precon when available called Steve jaimez and left 4 voicemails. any work completed with out a precon meeting is subject to rejection.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0624-01148
Permit Description: WOs T15407, T14541 & T84683. TEP TO PARK AND WORK IN THE ROW TO REMOVE 8 UTILITY POLES AND ASSOCIATED CONDUCTORS, FRAMING, ANCHORS, GUY WIRES, ETC. AND TRANSFER PRIMARY RISERS TO NEW J1 AND J2’s, COMPLETE (3) PBOXES, (2) PME9’s, AND (1) 6” FEEDER RISER, AND INSTALL (1) J1 AND TRANSFER PRIMARY RISER TO NEW J1 ON 3 WO’s T15407 (POLE REMOVAL), T14541 (FEEDER), AND T84683 (INSTALL NEW J1 AND TRANSFER EXISTING 2.5” RISER. Updated - 8/15/2024 - Request for Renewal/ Extention - Request for 30 day extension as of 8/23/2024..
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/23/2024 TRSP - ROW - Barricade - Setup/Routine Passed Work already completed
09/23/2024 TRSP - ROW - Barricade Takedown Passed
09/23/2024 TRSP - ROW - Backfill - Placement/Compaction Passed work already completed
09/23/2024 TRSP - ROW - Final/Close-Out Passed
09/23/2024 TRSP - ROW - AERIAL INSTALLATION Passed work completed, poles and attachments have been removed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW