Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2201 S QUAIL HOLLOW DR
Apply Date:
06/14/2024
Applicant:
Cox Communications
Description:
TRENCH 5' INSTALL NEW CATV CONDUIT FOR SYSTEM TIE

Permit Reviews

Permit Number - TR-UTL-0624-01147
Permit Status: Complete
Permit Description: TRENCH 5' INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Start Date Submittal Complete Date Status  
06/14/2024 RIGHT-OF-WAY REVIEW v.1 06/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0624-01147
Permit Status: Complete
Permit Description: TRENCH 5' INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 2
Date Name
06/14/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
06/14/2024 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0624-01147
Permite Description: TRENCH 5' INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/02/2024 TRSP - ROW - Barricade - Setup/Routine N/A Complete (Recurring)
08/02/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required site meeting

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0624-01147
Permit Description: TRENCH 5' INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 5
Date Description Inspector Results Comments
07/12/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed precon completed on phone with Kevin. work to completed within 2 weeks.
08/12/2024 TRSP - ROW - Barricade - Setup/Routine Passed
09/24/2024 TRSP - ROW - Backfill - Placement/Compaction Passed a krill complete, per previous inspection by Travis Horness no density is required
09/24/2024 TRSP - ROW - Barricade Takedown Passed all barricades and elements removed
09/25/2024 TRSP - ROW - Notice of Completion Passed all inspections complete, site closed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ273138-1 TUCSON_V1.PDF DOCUMENTS VIEW
RL-44819_PRJ273138-1_2223 S QUAIL HOLLOW DR_TCP_V1.PDF DOCUMENTS VIEW